In the fruitful month of September, Lei Shing Hong Energy (LSHE) has reached another significant milestone—two GT130 units were successfully delivered and are now on their way to Shandong. These units integrate world-leading technology, exceptional energy conversion efficiency, outstanding low-carbon emission capabilities, and a comprehensive after-sales service system. Since their introduction, they have consistently garnered widespread recognition and preference in the domestic distributed energy market.

The distributed energy station project is located in Linyi, Shandong. Its core configuration consists of two 15MW-class gas turbine generator sets paired with waste heat boilers. Upon commissioning, the project will effectively reduce energy costs for the enterprise, enhance the reliability of electricity and heat supply, meet production-related energy demands, and contribute to achieving energy conservation and carbon reduction goals.
Poised for Action, Embarking on a New Journey
The unit shipment ceremony was grandly held in front of the LSHE building, filled with a warm and celebratory atmosphere. Two GT130 units stood ready for dispatch, and as the transport vehicles slowly drove through the main gate, they officially marked the beginning of a new journey. This milestone signifies another solid step forward for LSHE in the field of green energy equipment supply.

Mission Accomplished, Efficiency Defined
After one day of efficient transportation, the units successfully arrived at the project site in Shandong. The staff promptly began preparations for unloading, demonstrating the "LSHE Speed" through their professional actions to ensure seamless progress in the subsequent stages of the project.