Project Background
This project has a total processing capacity of 530 t/d, comprising 200 t/d of kitchen waste, 300 t/d of restaurant waste, and 30 t/d of waste cooking oil. Guided by the principle of maximizing resource utilization and minimizing pollutant emissions, it integrates clean production, comprehensive resource utilization, ecological design, and sustainable consumption to achieve the treatment objectives of resource recovery, harmless treatment, and waste reduction for wet waste.
Project Location:
Jiading, Shanghai
Equipment Provided:
2*CG170-16/1560KW/10.5KV
Commissioning & Service:
Commissioned in early 2021 / Self-consumption with surplus electricity fed into the grid