Project Background
The power energy station is equipped with a 2MW gas internal combustion engine, coupled with a flue gas/hot water-driven lithium bromide absorption chiller and other auxiliary systems. All electricity generated is fed into the grid, while any shortfall in cooling capacity from the absorption chiller is supplemented by electric refrigeration units. The system achieves an annual comprehensive energy utilization rate exceeding 85%.
Project Location:
Haining, Zhejiang
Equipment Provided:
1*CG170-20/2000KW/10.5KV
Commissioning & Service:
Commissioned in August 2021 / Full-grid-feed (all electricity fed into the grid)